LAHomework Sign in
Stevenson Ranch, CA 91381 · Tulip Grove St

25830 Tulip Grove St

Built 2002 · 3,738 sq ft
LOT 13,444 SQ FT · 1 STRUCTURE · APN 2826-132-034Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2002
Living area
3,738 sqft
Lot size
13,444 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
2826-132-034

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2022 to 2032From build year 2002
20262035
HVACWorth a look now
Usually done by 2022From build year 2002
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 14 homes on Tulip Grove St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileElectrical: Main Panel Upgrade To 225 Amps
  • 2021
    permit on fileGeneral remodel: Attached Trellis (287 Sq Ft) And Attached Deck (190 Sq Ft) With Trellis (167 Sq Ft).
  • 2021
    permit on fileSolar: Add Energy Storage System With 3 Batteries 14 Kwh Each And 1 -125 Amp Sub Panel To Existing Solar System
  • 2021
    permit on filePool: Fiberglass Pool (510 Sq Ft)And Spa (72 Sq Ft) By City Of Los Angeles Research Report 25547 And Icc Esr 2014.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2022
  • Now
    Roof replacementExpected 2022 to 2032