LAHomework Sign in
Stevenson Ranch, CA 91381 · Flemming Pl

25817 Flemming Pl

Built 2000 · 3,785 sq ft
LOT 9,225 SQ FT · 1 STRUCTURE · APN 2826-116-003Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2000
Living area
3,785 sqft
Lot size
9,225 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
2826-116-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2020 to 2030From build year 2000
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 12 homes on Flemming Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on filePool: Replaster (E) Pool, Approx 125 Lft.
  • 2025
    permit on fileSolar: Solar Roof Mount System Install With 2 Tesla Powerwall 3 Batteries And 200A Critical Load Panel
  • 2025
    permit on file, unconfirmedElectrical: Install (1) Gfci Outside On (E) Bbq.
  • 2025
    permit on filePlumbing: (N) Gas Line For (E) Bbq Only.
  • 2024
    permit on fileBathrooms: Second Floor Master Bathroom Non-Structural Remodel.
  • 2024
    permit on file, unconfirmedElectrical: Electrical For Second Floor Master Bathroom Non-Structural Remodel.
  • 2024
    permit on file, unconfirmedPlumbing: Plumbing For Second Floor Master Bathroom Non-Structural Remodel.
  • 2024
    permit on file, unconfirmedSolar: Residential Roof Mount Pv System, 16.810Kw, 41 Modules, 2 New Batteries, 1 New 125A Sub Panel
  • 2023
    permit on file, unconfirmedSolar: Install (N) Roof-Mounted Pv System On Residence- 15.2 Kw, 38 Panels, 836 Sq Ft Array.
  • 2023
    permit on file, unconfirmedElectrical: Install (1) Energy Storage System, And (N) Main Panel Upgrade To 225 Amp.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2020 to 2030