LAHomework Sign in
Calabasas, CA 91302

25604 Brisbane Ct

Built 1990 · 5,710 sq ft
LOT 20,452 SQ FT · 1 STRUCTURE · APN 2049-040-010Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1990
Living area
5,710 sqft
Lot size
20,452 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
6
Home type
Single-family
Parcel (APN)
2049-040-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedRoof: Remove & Dispose Off Existing Roofing Material, Install New Roof, Re-Flash Pipes, Vent To Code. Owens Corning Shingles 340 Sqft Icc-Es Ac438 Class A
  • 2022
    permit on fileSolar: 6.290 Kw Dc Pv 17 (N) Silfab Sil-370 Bk Solar Modules Each With A (N) Enphase Iq8Plus-72-2-Us Micro-Inverter, 2 (N) Tesla Powerwall 2 Ess, (N) 400A Split Bus (N) 200A Localized Bus (N) 200A Main Breaker & (N) 200A Branch Breaker (N) 200A Tesla Backup Gateway 2 (N) 200A Breaker , (N) 200A Slected Loa
  • 2022
    permit on file, unconfirmedElectrical: 2X Tesla Powerwalls, 200A Subpanel, 400A Main Panel, Reconnect 125A Subpanel. Related To Unc-Solr221101006310.
  • 2020
    permit on filePlumbing: Like For Like Replacement Of (E) Gas Line For (E) Pool Heater

Manage this home to schedule a service or to update the timeline.