LAHomework Sign in
Stevenson Ranch, CA 91381 · Crockett Ln

25580 Crockett Ln

Built 1995 · 1,622 sq ft
LOT 6,320 SQ FT · 1 STRUCTURE · APN 2826-067-001Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1995
Living area
1,622 sqft
Lot size
6,320 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2826-067-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2025From build year 1995
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 47 homes on Crockett Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileGeneral remodel: Remove And Replace (1) Living Room Door Like For Like
  • 2021
    permit on fileElectrical: Electrical For Master Bathroom And Kitchen Remodel
  • 2021
    permit on fileHeating & cooling: Mechanical For Master Bathroom And Kitchen Remodel
  • 2021
    permit on filePlumbing: Plumbing For Master Bathroom And Kitchen Remodel
  • 2021
    permit on fileKitchen: Complete Master Bathroom Remodel, Sink, Shower, Toilet (40 Sq. Ft.), Replacing Kitchen Cabinet With Countertops And Sink. Shower To Have Tempered Glass Enclosure (70 Sq. Ft.), No Structural Changes Or Wall Removals
  • 2021
    permit on file, unconfirmedBathrooms: Remodel 2Nd Floor Hallway Bathroom, Install New Tub - Same Location, Install 2 New Vanity - Same Location, Install New Fan, Toilet Same Location, 5 Units Of Recess Lights, 2 Gfci, 2 Switches, No Structural Changes, Tempered Glass Required For Shower Enclosure If Applicable
  • 2021
    permit on fileGeneral remodel: Replacing Back Entry Door R/H Inswing
  • 2019
    permit on filePlumbing: Gasline For Fire Pit And Bbq.
  • 2019
    permit on fileElectrical: Misc Conduit For Future Spa, Fountain, Outdoor Use. 5' Min From Property Line.
  • 2019
    permit on fileHeating & cooling: Relocate Condenser Unit In Back Yard.
  • 2019
    permit on fileElectrical: Upgrade Main Service Panel From 100Amp To 200Ap And Add Outlets And Light Fixtures.
  • 2019
    permit on fileSolar: New Roof Mounted Pv System - 7.1Kw, 20 Panels, 389 Sq Ft.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2025