LAHomework Sign in
Stevenson Ranch, CA 91381 · Hemingway Ave

25562 Hemingway Ave Unit B

Built 1995 · 1,667 sq ft
SHARED CONDO LOT · APN 2826-069-075Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1995
Living area
1,667 sqft
Lot
Shared (condo complex)
Bedrooms
3
Bathrooms
3
Home type
Condo / townhome
Parcel (APN)
2826-069-075

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2025From build year 1995
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 96 homes on Hemingway Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedGeneral remodel: Units A-D: T/Off (E) Tile. Replace Underlayment And Sheathing As Needed. Sheathing To Be Min. 1/2" Apa Rated With 10D Nails At 6" O.C. At Edge And 10D At 12" O.C. At Field. 4,200 Sq Ft
  • 2023
    permit on fileHeating & cooling: Hvac Changeout In Attic And Right Side Yard With 5' Minimum Setback
  • 2020
    permit on fileWater heater: Water Heater Replacement Located In Gargage

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2025
  • 2030
    Water heater replacementExpected 2030 to 2035