LAHomework Sign in
Stevenson Ranch, CA 91381 · Sinclair Pl

25509 Sinclair Pl

Built 2000 · 3,107 sq ft
LOT 8,503 SQ FT · 1 STRUCTURE · APN 2826-093-021Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2000
Living area
3,107 sqft
Lot size
8,503 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
2826-093-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2020 to 2030From build year 2000
20262035
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 16 homes on Sinclair Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileHeating & cooling: Hvac Changout In Backyard With 5' Min Set Back.
  • 2021
    permit on fileSolar: Roof Mount Pv Solar System, 13.545 Kw Dc, 43 Panels, 1 Inverter, 1 Battery Back Up 9.8 Kw, Main Breaker Derate To 150 Amp, 200 Amp And 100 Amp Sub Panels
  • 2021
    permit on fileElectrical: (1) Lg Chem Battery Back Up 9.8Kw, (1) 200A Backup Panel, (1) 100A Load Center

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2020 to 2030