LAHomework Sign in
Glendale, CA 91206 · Hollister Ter

2525 Hollister Ter

Built 1928 · 1,871 sq ft
LOT 7,099 SQ FT · 1 STRUCTURE · APN 5666-009-026Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
1,871 sqft
Lot size
7,099 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5666-009-026

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2005
Expected 2025 to 2035From the 2005 permit
20262035
HVACOn record 2008
Expected 2023 to 2028From the 2008 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 133 homes on Hollister Ter →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on filePool: Partial Pool Demolition And Back Filling For Landscaping. Demolition And Removal Of Bond Beam And Addition Of Pool Shell Bottom Drainage
  • 2008
    permit on fileHeating & cooling: 1 Duct
  • 2006
    permit on fileElectrical: Install One Branch Circuit.
  • 2005
    permit on fileRoof: Repairs/Reframing Of Garage Roof. No Floor/No Pitch Increase, Repair (E) Ceiling/Roof Framing-E Stucco (Reroof Under Separate Permit Br 20051265).

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementExpected 2023 to 2028
  • Now
    Roof replacementExpected 2025 to 2035