LAHomework Sign in
Los Angeles, CA 90046 · Crest View Dr

2515 Crest View Dr

Built 1962 · 2,705 sq ft
LOT 18,480 SQ FT · 2 STRUCTURES · APN 5564-032-041Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1962
Living area
2,705 sqft
Lot size
18,480 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
5564-032-041

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 26 homes on Crest View Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileSolar: [Eplan] Pv1 New Roofotp Mounted System, System Size Is 3.16 Kwdc (3.8Kwac), System Includes 8 Modules With 8 Rsd And A Central Inverter, System Is Interconnected To An Existing 22A Msp.
  • 2022
    permit on fileGeneral remodel: Convert Storage Area Into J.A.D.U. Per State Law. "Comply With Department Order"
  • 2021
    permit on filePlumbing: Install Sub Water Meter For Irrigation. "Comply With Department Order Effective Date11/24/2020. Permit Will Expire 30 Days From Issuance Date".
  • 2020
    permit on fileElectrical: Main Panel Upgrade 225A
  • 2019
    permit on file, unconfirmedSolar: Pv1 Install Roof Mounted Pv System Sized 9Kw Ac Interconnected With Ms · SUNRUN
  • 2019
    permit on fileSolar: [Eplan] Pv1 New Roof-Top Solar Installation 7.6 Kwac (10.05Kwdc) Using · SOLARMAX RENEWABLE ENERGY PROVIDER INC

Manage this home to schedule a service or to update the timeline.