LAHomework Sign in
Altadena, CA 91001 · Olive Ave

2511 Olive Ave

Built 1926 · 1,192 sq ft
LOT 7,122 SQ FT · 2 STRUCTURES · APN 5828-023-033Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1926
Living area
1,192 sqft
Lot size
7,122 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
1
Home type
Single-family
Parcel (APN)
5828-023-033

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 145 homes on Olive Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedHeating & cooling: Mechanical For An Eaton Fire Rebuild (N) Detached 1-Story Adu 704 S.F. (2 Bedrooms And 2 Bathrooms)
  • 2025
    permit on file, unconfirmedElectrical: Electrical For An Eaton Fire Rebuild (N) Detached 1-Story Adu 704 S.F. (2 Bedrooms And 2 Bathrooms)
  • 2025
    permit on file, unconfirmedPlumbing: Plumbing For An Eaton Fire Rebuild (N) Detached 1-Story Adu 704 S.F. (2 Bedrooms And 2 Bathrooms)
  • 2025
    permit on file, unconfirmedPlumbing: Sewer For An Eaton Fire Rebuild (N) Detached 1-Story Adu 704 S.F. (2 Bedrooms And 2 Bathrooms)
  • 2025
    permit on fileGeneral remodel: Flat Section / Partial Shingle Area. Remove Damaged Materials And Install Single Ply Tpo Flat Area. Install Composition Shingles To Match Existing. Class A. Tpo: 0676-0001 Everguard® Tpo (White) . Crrc 0676-0153A Timberline Hdz® Reflector Series Plus™ Charcoal Plus. Approx 10 Squares.
  • 2023
    permit on fileRoof: Reroof 17 Sf Main House Only Shingles Crrc#0676-0153A Charcoal Plus Gray Sri 20 (Detached Garage Not Included) - Install Tri Shingle P4 On Partial Area Around 5 Sf

Manage this home to schedule a service or to update the timeline.