LAHomework Sign in
Los Angeles, CA 90210 · Coldwater Canyon Dr

2450 Coldwater Canyon Dr

Built 2000 · 3,059 sq ft
LOT 61,714 SQ FT · 1 STRUCTURE · APN 4388-003-018Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2000
Living area
3,059 sqft
Lot size
1.42 acres
Structures on lot
1
Bedrooms
3
Bathrooms
4
Home type
Single-family
Parcel (APN)
4388-003-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2020 to 2030From build year 2000
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 215 homes on Coldwater Canyon Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedRoom addition: Eplan: Storage Conversion To Adu Per Lamc 12.22 A.33(C) And (E) In (E) 2-Story Sfd W/Attached Garage
  • 2026
    permit on file, unconfirmedElectrical: Install A Dedicated Outlet For A Water Heater And General-Purpose Indoor Outlets Within The Proposed Accessory Dwelling Unit (Converted From An Existing Storage Room)."Comply With Department Order Effective Date03/12/2025. Permit Will Expire 30 Days From Issuance Date".
  • 2026
    permit on file, unconfirmedPlumbing: Plumbing Work For Adu. (Ref Building Permit #25016-10000-10411) "Comply With Department Order Effective Date 03/12/2025. Permit Will Expire 30 Days From Issuance Date"
  • 2026
    permit on file, unconfirmedWater heater: Repipe Gas Line For Adu And Install Water Heater."Comply With Department Order Effective Date03/12/2025. Permit Will Expire 30 Days From Issuance Date"
  • 2025
    permit on fileKitchen: Kitchen Remodel Combined With Hvac For Residential Buildings (No Structural Changes).Windows (10) And Doors (5) Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In A
  • 2020
    permit on fileWater heater: Replacing Water Heater

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2020 to 2030
  • 2030
    Water heater replacementExpected 2030 to 2035