LAHomework Sign in
Glendale, CA 91206 · Edwards Pl

245 Edwards Pl

Built 1966 · 1,937 sq ft
LOT 6,818 SQ FT · 1 STRUCTURE · APN 5666-020-040Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1966
Living area
1,937 sqft
Lot size
6,818 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5666-020-040

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2002
Expected 2022 to 2032From the 2002 permit
20262035
HVACOn record 2004
Usually done by 2024From the 2004 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 27 homes on Edwards Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2004
    permit on fileHeating & cooling: One Fau Up To 100000 And One A/C 3-15 Hp And One Electrical A/C & Compressor Added. - - Change Out Fau/Coil In Closet A/C In Side Yard.
  • 2002
    permit on fileRoof: Material: Comp Shingle. Class A - No. Of Squares: 39 Sqs - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 1 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sh

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2024
  • Now
    Roof replacementExpected 2022 to 2032