LAHomework Sign in
Los Angeles, CA 91304

24358 S Sterling Ranch Rd

Built 2021 · 3,319 sq ft
LOT 10,170 SQ FT · APN 2017-039-019Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2021
Living area
3,319 sqft
Lot size
10,170 sqft
Bedrooms
4
Bathrooms
5
Home type
Single-family
Parcel (APN)
2017-039-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
Water heaterComing up
Expected 2031 to 2036From build year 2021
20262035
See 2 more systems expected later
RoofLater
Expected 2041 to 2051Original, built 2021
HVACLater
Expected 2036 to 2041Original, built 2021

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: (Eplan) Pv For Installation Of Roof Mounted Solar Panels With Existing Solar. Pv System Includes 30 Modules With 30 Microinverters And 1 Combiner Box Connected To Existing Main Service Panel. System Size Is 13.20Kw Dc/9.60Kw Ac.
  • 2022
    permit on filePool: New 13.5 X 34 Pool With 8 X 8 Spa Inside Pool Max Depth On Pool 5' Max Depth On Spa 3.6 Gas Heater And Shotcrete
  • 2021
    permit on fileSolar: [Eplan] Pv1. Installation Of 3.15 Kw Dc Roof Mounted Pv System. (9) Ac Modules.

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2031
    Water heater replacementExpected 2031 to 2036