LAHomework Sign in
Harbor City, CA 90710 · Doble Ave

24315 Doble Ave

Built 1965 · 2,301 sq ft
LOT 5,732 SQ FT · 1 STRUCTURE · APN 7409-021-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1965
Living area
2,301 sqft
Lot size
5,732 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
7409-021-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2025
Expected 2035 to 2040From the 2025 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 16 homes on Doble Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileWater heater: Remove/Replace 50 Gal Gas Water Heater In Garage. Like For Like Same Location. Inspected And Finaled.
  • 2022
    permit on fileRoof: 26Sqs Shingle Re Roof: Tear Off Existing Roof Material Install 7/16" Osb Plywood Over Existing Spaced Sheathing, Apply 1 Layer Of Synthetic Underlayment Install Owens Corning Duration Cool Shingle. *No Work To Be Done On Flat Roof Sections.
  • 2022
    permit on fileElectrical: Upgrade Main Panel Box To 225A Busbar With 200A Main Breaker
  • 2022
    permit on fileSolar: 7.4 Kw W/ 20 Panasonic Evpv 370 & Iq7+ & Sunlight Backup (No Battery)
  • 2022
    permit on file, unconfirmedBathrooms: Bathroom Remodel Including Plumbing, Electrical, Mechanical, Tile And Patching
  • 2022
    permit on file, unconfirmedPlumbing: Plumbing For Bathroom Remodel
  • 2022
    permit on file, unconfirmedElectrical: Electrical For Bathroom Remodel
  • 2022
    permit on file, unconfirmedHeating & cooling: Bathroom Fan

Manage this home to schedule a service or to update the timeline.