LAHomework Sign in
Los Angeles, CA 90731 · S Meyler St

2431 S Meyler St

Built 1992 · 2,387 sq ft
LOT 4,479 SQ FT · 2 STRUCTURES · APN 7463-010-020Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1992
Living area
2,387 sqft
Lot size
4,479 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
7463-010-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2022From build year 1992
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 154 homes on S Meyler St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileGeneral remodel: Add Sill Plate Anchor Bolts And Plywood To Cripple Walls (If Existing) Per La City Standard Plan #1; No Foundation Replacement (Earthquake Hazard Reduction Per Chapter 92 Of The Los Angeles Building Code). (Houses, Residential Buildings Up To 3 Stories And Up To 4 Units).
  • 2023
    permit on fileElectrical: Add Circuits For Hvac System
  • 2023
    permit on fileHeating & cooling: Install Heat Pump System And Mini Split System (Upstairs)
  • 2023
    permit on fileHeating & cooling: Removal Of Prefabricated Freestanding Wood Stoveand Replacing With New Prefabricated Gas Directvent Freestanding Stove.
  • 2020
    permit on filePlumbing: Replacing Sewer On Property

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2022