LAHomework Sign in
Los Angeles, CA 90210

2423 N Briarcrest Rd

Built 2024 · 8,584 sq ft
LOT 29,368 SQ FT · 2 STRUCTURES · APN 4388-015-005Lot Structure
Nothing due in the next 5 years
Here is what to keep track of. Mark things as done as they happen and your timeline stays current.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2024
Living area
8,584 sqft
Lot size
29,368 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
7
Home type
Single-family
Parcel (APN)
4388-015-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

Nothing due in the next 5 years. Each system below shows its typical replacement years.
Typical replacement years
RoofLater
Expected 2044 to 2054Original, built 2024
HVACLater
Expected 2039 to 2044Original, built 2024
Water heaterLater
Expected 2034 to 2039Original, built 2024
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedElectrical: Run Dedicated Circuit And Connect Gate
  • 2023
    permit on file, unconfirmedPlumbing: Installation Of A Solar Water Heating System.
  • 2023
    permit on filePlumbing: Installation Of A Solar Water Heating System.
  • 2021
    permit on fileSolar: (E-Plan)New Pv1 Roof-Mounted Installation. Scope Of Work Includes 43 Modules, 43 Inegrated Microinverters, And 1 Subpanel Of 125 Amps.System Size: 15.91 Kw Dc; 13.545 Kw Acsolar Pv Installation Shall Comply With Los Angeles Fire Department'S Fire Prevention Bureau (Fpb) Requirement No. 96
  • 2020
    permit on file, unconfirmedElectrical: Plan Check For A New 600A Service, Relocating Existing 22Kw Generator On A Single Family Dwelling With All New Panels And Ckts On The Floor Plan.Note. All Ckts Fee Are Under Building Permit.
  • 2019
    permit on fileElectrical: Electrical Permit · SAAD MAHER
  • 2019
    permit on file, unconfirmedPool: (N) Swimming Pool & Spa · SAAD MAHER

Manage this home to schedule a service or to update the timeline.