LAHomework Sign in
Los Angeles, CA 91307 · Hartland St

23840 Hartland St

Built 1960 · 1,744 sq ft
LOT 7,064 SQ FT · 1 STRUCTURE · APN 2034-032-041Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1960
Living area
1,744 sqft
Lot size
7,064 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
2034-032-041

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2020
Expected 2040 to 2050From the 2020 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 261 homes on Hartland St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileKitchen: Interior Remodel To The (E) Kitchen And Bathroom, Reduce The Size Of The Laundry Room, Remove Two Load Bearing Walls And Replace Lighting In The Kitchen, Living Room And Family Room. "Comply With Department Order Effective Date06/12/2020. Permit Will Expire 30 Days From Issuance Date".
  • 2021
    permit on filePool: Alteration And Repair/Re-Plaster Of (E) Swimming Pool Per La Std Plan # 270.
  • 2021
    permit on file, unconfirmedHeating & cooling: Intallation Of Cooling Coil Condesing Unit On Furnace. New Ducting
  • 2020
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing ___30___Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labe
  • 2020
    permit on fileElectrical: Kitchen Recess Lights (5), Bathroom Lights (2), And Electric Outlets And Plugs (15)."Comply With Department Order Effective Date06/12/2020. Permit Will Expire 30 Days From Issuance Date". Hagopbadossian At (818)374-9840 899274.
  • 2020
    permit on fileElectrical: Install (1) 0 To 200Amp Service Panel And (3) Smoke Detectors
  • 2020
    permit on filePlumbing: Kitchen Sinks (1), Vanity (1), Toilet (1)"Comply With Department Order Effective Date06/12/2020. Permit Will Expire 30 Days From Issuance Date". Hagopbadossian At (818)374-9840 899274.

Manage this home to schedule a service or to update the timeline.