LAHomework Sign in
Topanga, CA 90290 · Topanga Skyline Dr

2365 Topanga Skyline Dr

Built 2002 · 3,122 sq ft
LOT 14,295 SQ FT · 1 STRUCTURE · APN 4436-011-008Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2002
Living area
3,122 sqft
Lot size
14,295 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
4436-011-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2022 to 2032From build year 2002
20262035
HVACWorth a look now
Usually done by 2022From build year 2002
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 69 homes on Topanga Skyline Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on file, unconfirmedSolar: Roof Mounted Solar Pv 8.84 Kw (26) Modules (N) 225A Distribution Panel, 1(N) 200A Internal, 1(N) 125A Square D Load Center (Ref: Elec210126000543)
  • 2021
    permit on file, unconfirmedElectrical: (N) 225A Distribution Panel, 1(N) 200A Internal, 1(N) 125A Square D Load Center (Ref: Solr201112002302)
  • 2020
    permit on file, unconfirmedPlumbing: Installing Gas Line To Bbq
  • 2020
    permit on file, unconfirmedElectrical: Installing An Outlet On An Outdoor Bbq Counter
  • 2018
    permit on fileGeneral remodel: Remove & Replace (E) Wood Burning Fire Place. Like For Like. Astria Georgian 50

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2022
  • Now
    Roof replacementExpected 2022 to 2032