LAHomework Sign in
Pasadena, CA 91107 · E Villa St

2341 E Villa St

Built 1927 · 1,540 sq ft
LOT 6,717 SQ FT · 3 STRUCTURES · APN 5744-020-006Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1927
Living area
1,540 sqft
Lot size
6,717 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5744-020-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 1995
Usually done by 2010From the 1995 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 145 homes on E Villa St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: Remove Existing Roof Material Repair Existing Sheathing Install New Roof Material Like For Like Material Replacement Torch Down And Tile Including Detached Garage
  • 2022
    permit on fileElectrical: Express Permit. Panel Upgrade To 200 Amp
  • 2009
    permit on fileGeneral remodel: Add Cripple Wall Plywood To (E) Foundation Structure In The (E) Hallway
  • 2009
    permit on fileElectrical: Upgrade Sub-Panel 100 Amp
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 1995
    permit on fileWater heater: Change Out Water Heater + Repipe

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2010