LAHomework Sign in
Glendale, CA 91201 · Jesse Ave

233 Jesse Ave

Built 1936 · 1,580 sq ft
LOT 5,050 SQ FT · 2 STRUCTURES · APN 5625-036-017Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1936
Living area
1,580 sqft
Lot size
5,050 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
1
Home type
Single-family
Parcel (APN)
5625-036-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2018
Expected 2038 to 2048From the 2018 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 16 homes on Jesse Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on filePlumbing: This Permit Is For Fixture Replacement Within The Same Location.
  • 2025
    permit on fileSolar: Roof Mount 3.28Kw, 8 Modules, 1 Inverter, 1 Ess (Existing Solar System Installed)
  • 2019
    permit on fileSolar: Solar Sfd
  • 2018
    permit on fileRoof: Roof
  • 2002
    permit on fileRoof: Material:Class A - No. Of Squares:13 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:3 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.