LAHomework Sign in
Glendale, CA 91208 · Sylvan Ln

2320 Sylvan Ln

Built 1924 · 1,691 sq ft
LOT 5,558 SQ FT · 2 STRUCTURES · APN 5653-015-019Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
1,691 sqft
Lot size
5,558 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5653-015-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2000
Expected 2020 to 2030From the 2000 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2010
Usually done by 2025From the 2010 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 23 homes on Sylvan Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileSolar: Install: (16) Roof Mounted Pv Solar Modules, (16) Enphase Iq8A-72-2-Us Inverter (240V). Upgrade Main Service Panel To 225A Bus Bar, 200A Main Breaker. (1) 200A Protected Load Panel W/150A Main (240V) For Back Up, 1Ph, 3W. (1) Enphase Encharge-10T-1P-Na Battery (10.5Kwh) System (1) Iq System Controll
  • 2022
    permit on fileSolar: Upgrade Main Service Panel To Solar-Ready 200-Amp Main Panel With 225-Amp Busbar.
  • 2010
    permit on fileWater heater: 1 Water Heater, 1 Earthquake Valve
  • 2010
    permit on filePlumbing: 1 Dishwasher
  • 2000
    permit on fileRoof: Material: Class A Bur. - No. Of Squares: 10 - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 2 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2020 to 2030
  • Now
    Water heater replacementUsually done by 2025