LAHomework Sign in
Los Angeles, CA 90031 · Glover Pl

2318 Glover Pl

Built 1965 · 3,008 sq ft
LOT 4,573 SQ FT · 1 STRUCTURE · APN 5445-018-005Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1965
Living area
3,008 sqft
Lot size
4,573 sqft
Structures on lot
1
Bedrooms
7
Bathrooms
4
Home type
Fourplex (4 units)
Parcel (APN)
5445-018-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 50 homes on Glover Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 40 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2023
    permit on file, unconfirmedGeneral remodel: Eplan: Enlose Portion Of (E) Covered Balcony In Existing Apt Unit For A New Closet (18.6 Sq. Ft. ). Replacement Of (E) Guardrail, Replacement Of (E) Exterior Stair Treads
  • 2023
    permit on filePlumbing: -Increase 80Ft Main Water Supply Pipe Size To 1.5 Inches-Increase 30Ft Pipe To 1.25 Inches
  • 2022
    permit on fileGeneral remodel: (25) Window And (12) Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 150.2(B) 1B Of Title 24.
  • 2022
    permit on fileKitchen: 4- Kitchen 4- Bathroom Remodel For Residential Buildings (No Structural Changes). Water Damage, Termite Damage/ Dry Rot Repair Less Than 10% Of Replacement Cost Of Residential Buildings.
  • 2022
    permit on fileElectrical: Install 10 Additional Recessed Lights Per Unit
  • 2022
    permit on fileElectrical: Replace 1 Subpanel Per Unit And Add 4 Circuit Per Unit.
  • 2022
    permit on fileElectrical: Replace Electrical Main Panel
  • 2022
    permit on filePlumbing: Replace Damaged Plumbing Parts

Manage this home to schedule a service or to update the timeline.