LAHomework Sign in
Glendale, CA 91201 · Raymond Ave

231 Raymond Ave

Built 1939 · 1,345 sq ft
LOT 4,932 SQ FT · 1 STRUCTURE · APN 5626-004-014Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1939
Living area
1,345 sqft
Lot size
4,932 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
5626-004-014

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2004
Expected 2024 to 2034From the 2004 permit
20262035
HVACOn record 2017
Expected 2032 to 2037From the 2017 permit
20262035
Water heaterOn record 2009
Usually done by 2024From the 2009 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 224 homes on Raymond Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2018
    permit on fileElectrical: One 200 Amp Service
  • 2017
    permit on fileHeating & cooling: 1 Fau, 1 Air Cond, 1 Duct
  • 2009
    permit on fileWater heater: 1 Shower /Shower Pan, 1 Water Heater (Tankless) And 1 Exterior Water Service
  • 2004
    permit on fileRoof: Material: Class A Comp Shingles (Garage) - No. Of Squares: 5 - Tear Off Existing (Y/N): Y - Existing No. Of Layers: 3 - New Sheathing (Y/N): Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spac
  • 2004
    permit on fileRoof: Material: Comp Shinlge Class A - No. Of Squares: 28 Sqs - Tear Off Existing (Y/N): Yes - Existing No. Of Layers: Three - New Sheathing (Y/N): Yes - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing S

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2024
  • Now
    Roof replacementExpected 2024 to 2034