LAHomework Sign in
Los Angeles, CA 90732 · S Moray Ave

2301 S Moray Ave

Built 1963 · 2,148 sq ft
LOT 9,065 SQ FT · 1 STRUCTURE · APN 7562-006-007Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1963
Living area
2,148 sqft
Lot size
9,065 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
7562-006-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 43 homes on S Moray Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileGeneral remodel: 10 Window And 1 Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 150(B) 1B Of Title 24.
  • 2021
    permit on fileKitchen: Interior Kitchen/Family Room Remodel To (E) Sfd. Scope Of Work To Include Replacement Of A Load Bearing Demising Wall With A Beam System Above The Ceiling Line Per Engineered Design. No Grading Work, No New Footing.
  • 2021
    permit on fileElectrical: Kitchen Remodel. Includes Installation Of New Led Lighting, Dimmer/Motion Sensor Switches, And Gfi And Tamper Proof Outlets.
  • 2021
    permit on fileElectrical: Panel Upgrade To Support Afci Breakers: New Panel Installed To Meet Ladwp Spot Request And Old Panel Will Be Converted To Sub-Panel
  • 2021
    permit on fileHeating & cooling: New A/C, Duct Dect, New Heat Pump, (Alterations To Space Conditioning Systems) (Formely Cf-1R-Alt-Hvac)

Manage this home to schedule a service or to update the timeline.