LAHomework Sign in
Beverly Hills, CA 90211 · S Hamel Dr

227 S Hamel Dr

Built 1932 · 2,062 sq ft
LOT 4,931 SQ FT · 2 STRUCTURES · APN 4333-016-003Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1932
Living area
2,062 sqft
Lot size
4,931 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
3
Home type
Single-family
Parcel (APN)
4333-016-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 33 homes on S Hamel Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedSolar: (Eplan) Install 12.24Kw Roof Mounted Pv System With 34 Modules And 34 Microinverters
  • 2022
    permit on file, unconfirmedKitchen: (E-Plan Bldg) Interior Remodel (1232 Sf) To Existing Sfr For New Open Floor Kitchen. New Bath, No Change To Number Of Bedrooms
  • 2022
    permit on file, unconfirmedHeating & cooling: Main House: Remove Kitchen Walls / Bathroom / Laundry To Create A Open Concept Kitchen/ Powder/ Pantry. Remodel Existing Master Bedroom To Create New Walk In Closet & New Closet In Existing Bedroom. New Cabinets And Fixtures Throughout S.F.D
  • 2022
    permit on file, unconfirmedElectrical: Main House: Remove Kitchen Walls / Bathroom / Laundry To Create A Open Concept Kitchen/ Powder/ Pantry. Remodel Existing Master Bedroom To Create New Walk In Closet & New Closet In Existing Bedroom. New Cabinets And Fixtures Throughout S.F.D
  • 2022
    permit on file, unconfirmedPlumbing: Main House: Remove Kitchen Walls / Bathroom / Laundry To Create A Open Concept Kitchen/ Powder/ Pantry. Remodel Existing Master Bedroom To Create New Walk In Closet & New Closet In Existing Bedroom. New Cabinets And Fixtures Throughout S.F.D
  • 2021
    permit on file, unconfirmedRoof: Re-Roof Flat Roof House Approx 16.5 Sq Install New Torch Cool Roof R/R Slope Tile Roof Of Approx 3 Squares

Manage this home to schedule a service or to update the timeline.