LAHomework Sign in
Rowland Heights, CA 91748 · Batson Ave

2252 Batson Ave

Built 2006 · 2,758 sq ft
SHARED CONDO LOT · APN 8253-013-102Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2006
Living area
2,758 sqft
Lot
Shared (condo complex)
Bedrooms
4
Bathrooms
4
Home type
Condo / townhome
Parcel (APN)
8253-013-102

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACWorth a look now
Expected 2021 to 2026From build year 2006
20262035
Water heaterWorth a look now
Usually done by 2021From build year 2006

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 129 homes on Batson Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedSolar: Rev Install 1X Ess Outside & Solar Modules Has Been Increased From 10 To 18. Updated From Agate To Connectder Msa Battery Electrical Connection Method Has Been Changed To A Load-Side Tap. Battery Has Been Relocated From South-East Wall To The South-West Wall. (Page Pv1, Pv1.1 & Pv1.2)
  • 2022
    permit on fileRoof: Reroof Sfr W/ Attached Garage (27 Sqs, Pitch 4/12): Remove And Reinstall (E) Roof Tile, C/O Plywood As Needed, Install Synthetic Underlayment,
  • 2022
    permit on fileSolar: Install (28) Solar Panels, Model #:Lg380N1C-A6. Install (28) Enphase Inverters. Sys. Size: 14.440Kw. Total Array Area: 775.20 Sq. Ft. Install New 225A.
  • 2022
    permit on file, unconfirmedElectrical: Install New 225A. Ref: Unc-Solr220405001631 *** Warning! Conductors Shall Not Exit The Back Of Any Surface Mounted Electrical Equipment; *** For Exterior Semi-Flush Mounted Electrical Equipment: Lath/Plaster Shall Not Be Installed Prior To Initial Inspection; *** For Exterior Surface Mounted Electri
  • 2022
    permit on fileElectrical: Install A 11.4 Kw Hardwired Tesla Ev Charger And A 240 Outlet

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2021
  • Now
    HVAC replacementExpected 2021 to 2026