LAHomework Sign in
Los Angeles, CA 90068 · Chelan Pl

2251 Chelan Pl

Built 1962 · 3,574 sq ft
LOT 59,092 SQ FT · 2 STRUCTURES · APN 5572-014-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1962
Living area
3,574 sqft
Lot size
1.36 acres
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
5572-014-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 8 homes on Chelan Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: (Eplan) Pv1 For Installation Of Roof Mounted Solar Panels. Pv System Includes 25 Modules With 25 Microinverters, And 1 Combiner Box Connected To Existing Main Service Panel. System Size Is 10.75Kw Dc/7.5Kw Ac. Installation Of A Residential Roof-Mounted Solar Photovoltaic (Pv) System, Sizing 10.75 Kw
  • 2024
    permit on file, unconfirmedRoom addition: Addition And Alteration To (E) Single Family Dwelling W/ Att Garage, Scope Of Work To Include:Windows And Door Change Out, Remove And Replace (E) Roof Over Garage; Enclose (E) Area Below Roof To Extend (E) Bathroom And Interior Remodel. ***See Comments***

Manage this home to schedule a service or to update the timeline.