LAHomework Sign in
Los Angeles, CA 90031 · Fernleaf St

2248 Fernleaf St

Built 1925 · 1,820 sq ft
LOT 5,076 SQ FT · 2 STRUCTURES · APN 5445-025-009Lot Structure
0 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
1,820 sqft
Lot size
5,076 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
5445-025-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterOn record 2025
Expected 2035 to 2040From the 2025 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 51 homes on Fernleaf St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Install New Electrical Meter
  • 2025
    permit on fileKitchen: 8 Window(S). Window And Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Title 24, Part 6, Section 150.
  • 2025
    permit on fileKitchen: 5 Window(S). Window And Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Title 24, Part 6, Section 150.
  • 2025
    permit on fileBathrooms: Eplan Sfd Remodel To Bedroom, Bathroom, And Convert Laundry Room To Walk-In-Closet
  • 2025
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 8 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Prod
  • 2025
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over New Solid Sheathing 8 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product L
  • 2025
    permit on fileElectrical: Install (1) 100 Amp Sub-Panel, (1) 200 Amp Sub-Panel, New Circuits And New Wires.
  • 2025
    permit on fileWater heater: Install New Tankless Water Heater & Washer/Dryer
  • 2025
    permit on fileHeating & cooling: Install 2 Mini Split Units (1) In Each Unit And Exhaust Fans.

Manage this home to schedule a service or to update the timeline.