LAHomework Sign in
Los Angeles, CA 91364 · Cass Ave

22449 Cass Ave

Built 2002 · 6,193 sq ft
LOT 13,860 SQ FT · 1 STRUCTURE · APN 2075-007-003Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2002
Living area
6,193 sqft
Lot size
13,860 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
2075-007-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACWorth a look now
Usually done by 2022From build year 2002
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 222 homes on Cass Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: (Eplan) Pv1 For Installation Of Roof Mounted Solar Panels. Pv System Includes 47 Modules With 47 Microinverters And 1 Combiner Box Connected To Existing Main Service Panel. System Size Is 20.68Kw Dc/15.51Kw Ac.
  • 2026
    permit on file, unconfirmedElectrical: Electrical For Mini Splits."Comply With Department Order Effective Date03/05/2026. Permit Will Expire 30 Days From Issuance Date".
  • 2026
    permit on file, unconfirmedHeating & cooling: (7) Mini Splits. "Comply With Department Order Effective Date03/05/2026. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on file, unconfirmedSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2025
    permit on file, unconfirmedElectrical: 225A Subpanel With 200A Breaker
  • 2022
    permit on fileRoof: Reroof With 32 Sqrs Built Up Roofing. Existing Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May Be

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2022