LAHomework Sign in
Los Angeles, CA 91303 · Hamlin St

22245 Hamlin St

Built 1958 · 1,884 sq ft
LOT 7,465 SQ FT · 2 STRUCTURES · APN 2139-012-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1958
Living area
1,884 sqft
Lot size
7,465 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
2139-012-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 16 homes on Hamlin St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 28 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2023
    permit on fileSolar: [Eplan] Pv1 New Rooftop Mounted System Size Is 3.1Kw Dc/ 6Kwac, System Includes 8 Modules With Optimzers And A Central Inverter, System Is Interconnected To An Existing 225A Msp Along With An Existing Pv System.Note, Main Breaker Being Derated To 150 Amp Shall Be Under A Separate Permit.
  • 2023
    permit on file, unconfirmedElectrical: Main Breaker Derate: Replace Existing 200 Amp Mainbreaker With New 150 Amp Main Breaker.
  • 2013
    permit on filePlumbing: Plumbing Permit · GOLDEN BEST PLUMBING INC

Manage this home to schedule a service or to update the timeline.