LAHomework Sign in
Los Angeles, CA 91364 · Miston Dr

22226 Miston Dr

Built 1968 · 1,897 sq ft
LOT 10,931 SQ FT · 1 STRUCTURE · APN 2169-021-070Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1968
Living area
1,897 sqft
Lot size
10,931 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
2169-021-070

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 16 homes on Miston Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 7 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Prod
  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over New Solid Sheathing (7 ) Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Produc
  • 2023
    permit on fileElectrical: Express Permit For A New Subpanel, Service Upgrade To 225Amp, Derate The Main Breaker And A New Enphase Battery.
  • 2023
    permit on fileSolar: Pv1 Pc For Installation Of Roof Mounted Solar Panels. Pv System Includes 15 Modules With 15 Micro Inverters, 1 Combiner Box, 1 Energy Storage System, 1 Backup Panel, And 1 Iq Gateway Controller Connected To Main Service Panel. System Size Is 6Kw Dc/4.95Kw Ac.
  • 2023
    permit on fileHeating & cooling: Change Out Hp Condenser And Air Handler
  • 2021
    permit on file, unconfirmedSolar: (E-Plan)$0 Fees Per Ab-1414.New Pv1 Installation. Scope Of Work Includes 184 Solar Roof Tiles, 2 Inverters, 3 Energy Storage Systems, 1 Panel Of 200 Amps, And 1 Panel Of 125 Amps. System Size: 10.76 Kw Dc; 11.4 Kw Ac

Manage this home to schedule a service or to update the timeline.