LAHomework Sign in
Glendale, CA 91201 · Thompson Ave

222 Thompson Ave

Built 1937 · 1,252 sq ft
LOT 5,051 SQ FT · 2 STRUCTURES · APN 5625-036-011Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1937
Living area
1,252 sqft
Lot size
5,051 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5625-036-011

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2010
Expected 2030 to 2040From the 2010 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 245 homes on Thompson Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileKitchen: Bathroom Remodel Like For Like, No Structural Changes, No Exterior Work
  • 2023
    permit on fileElectrical: 14-50 Nema Outlet. No Exterior Work Visible From The Street. Installation Of The Ev Charger Does Not Affect The Parking Of Vehicles In Garage
  • 2015
    permit on fileElectrical: 1 200 Amp Service
  • 2015
    permit on fileSolar: Flat Roof (Y/N):No Battery Back-Up (Y/N):No Roof Mounted (Y/N):Yes Photovoltaic (Y/N):Yes Number Of Arrays:14 Number Of Branch Circuits: Size Of Water Storage Tank: Amp Service: Hp Transformer (Hp = Kw & Kva): Kw (Kilowatt):
  • 2010
    permit on fileRoof: Residential Reroof As Follows: This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Comp Shingle Owens Corning Desert Fan Squares (100 Sf) Being Installed: 21 Sqs Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: Two New Sheathing Being Installed (Y/N): Yes With Osb Plywo

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Roof replacementExpected 2030 to 2040