LAHomework Sign in
Pasadena, CA 91101 · S Marengo Ave

222 S Marengo Ave

Built 1978 · 1,439 sq ft
SHARED CONDO LOT · APN 5722-024-081Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1978
Living area
1,439 sqft
Lot
Shared (condo complex)
Bedrooms
3
Bathrooms
3
Home type
Condo / townhome
Parcel (APN)
5722-024-081

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2026
Expected 2046 to 2056From the 2026 permit
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 278 homes on S Marengo Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileRoof: Replace (2) Existing Windows With (2) New Title 24 Compliant, Like For Like, Waterproof Around Outside Of Windows As Required (Dining Room Windows)
  • 2024
    permit on fileHeating & cooling: Mechanical Permit For Bathroom And Closet Remodel In Primary Bedroom
  • 2024
    permit on fileBathrooms: Bathroom And Closet Remodel In Primary Bedroom
  • 2024
    permit on fileElectrical: Electrical Permit For Bathroom And Closet Remodel In Primary Bedroom
  • 2024
    permit on filePlumbing: Plumbing Permit For Bathroom And Closet Remodel In Primary Bedroom
  • 2022
    permit on fileSolar: Install 7.20 Kw Roof Mounted Pv Solar, 18 Modules, 1 Inverter
  • 2022
    permit on fileSolar: Express Permit. Replace Electrical Sub-Panel To New Version That Will Work With Future Solar Installation Project (Solar Installation Will Be Permitted Separately)
  • 2002
    permit on fileHeating & cooling: Hood Appliance For Non-Structural Kitchen Remodel
  • 2002
    permit on fileElectrical: Electrical Work For Non-Structural Kitchen/Bathroom Remodel
  • 2002
    permit on filePlumbing: Plumbing Work For Non-Structural Kitchen/Bathroom Remodel

Manage this home to schedule a service or to update the timeline.