LAHomework Sign in
Glendale, CA 91206 · E Chevy Chase Dr

2214 E Chevy Chase Dr

Built 1955 · 1,048 sq ft
LOT 7,006 SQ FT · 1 STRUCTURE · APN 5662-017-016Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1955
Living area
1,048 sqft
Lot size
7,006 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5662-017-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2003
Expected 2023 to 2033From the 2003 permit
20262035
HVACOn record 2019
Expected 2034 to 2039From the 2019 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 244 homes on E Chevy Chase Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileBathrooms: Bathroom Remodel. Replace Fixtures In Same Location. No Movement Of Walls. No Structural Changes. No Exterior Changes. Includes Trades And Single Vent Fan
  • 2019
    permit on fileHeating & cooling: 1 Fau, 1 Compressor, 1 Duct
  • 2017
    permit on fileElectrical: 1 200 Amp Service
  • 2003
    permit on fileRoof: Material: Composition Shingles Class A (House With Attached Garage) - No. Of Squares: 14 - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 1 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be I

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2023 to 2033