LAHomework Sign in
Glendale, CA 91202 · Spencer St

221 Spencer St

Built 1930 · 2,914 sq ft
LOT 8,915 SQ FT · 2 STRUCTURES · APN 5633-001-013Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1930
Living area
2,914 sqft
Lot size
8,915 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
5633-001-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2004
Expected 2024 to 2034From the 2004 permit
20262035
HVACOn record 2018
Expected 2033 to 2038From the 2018 permit
20262035
Water heaterOn record 2004
Usually done by 2019From the 2004 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 66 homes on Spencer St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileGeneral remodel: New Walkway From Sidewalk To House And Three Lamp Post
  • 2021
    permit on filePlumbing: Spot Repair On Sewer Line In Front Yard
  • 2018
    permit on fileHeating & cooling: 2-Fau Up To 100,000Btu 2-Up To 3Hp 2-Electrical A/C Changeout Same Location
  • 2015
    permit on fileElectrical: 1 Outlet, 1 Circuit
  • 2013
    permit on fileGeneral remodel: Voluntary Foundation Bolting And Bracing Per La Standard Plan
  • 2013
    permit on fileGeneral remodel: Repair (E)Damaged Chimney From Throat Up, Per Case 2 Of City Standard Plan To Match Existing Location, Size, Height, And Exterior.
  • 2012
    permit on filePlumbing: 1-Building Sewer
  • 2008
    permit on fileSolar: Solar Panel On The Garage & Trellace Not Exceed 2.7 Pds Per Sq Ft - This Is A Combination Building//Electrical/ Permit
  • 2004
    permit on fileWater heater: 1 Lawn Sprinkler System, 1 Water Heater.
  • 2004
    permit on filePlumbing: One Sink, One Drain, One Exterior Water Service, One Low Pressure Gas System.
  • 2004
    permit on fileGeneral remodel: Freestand Walls And Rebuilding Front Entryway Stairs - Walls 34--0" 4--0" Max Hi And New Front Stairs With Three Risers.
  • 2004
    permit on fileElectrical: One Circuit And 4 Outlets
  • 2004
    permit on fileElectrical: (1) Sub Panel 20 Spaces.
  • 2004
    permit on fileElectrical: 34 Branch Circuits
  • 2004
    permit on fileHeating & cooling: 2 Heating Appliances Under 100000 B.T.U, 2 Appliance Vents,2 Compressors Under 3 Ton And 2 Electrical A/C & Compressor Added
  • 2004
    permit on filePlumbing: 1 Re-Pipe Sfd ( 3 Bath )
  • 2004
    permit on fileKitchen: 13 Windows Change Out To Wood French Windows Sliding Dual Windows To Double French Door, Change Out Of Front Door. - - Kitchen Remodel - - This Permit Includes Electrical, Plumbing And Electrical Service Upgrade
  • 2004
    permit on fileRoof: Material: Tile 10Lb Sq. Ft. ( Reuse Exist Tile) Class A - No. Of Squares: 5 Sqs. (Garage) - Tear Off Existing (Y/N): Yes - Existing No. Of Layers: One/Tile - New Sheathing (Y/N): No - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. T
  • 2004
    permit on fileRoof: Material: Tile 10Lb Sq. Ft. ( Reuse Exist Tile) Class A - No. Of Squares: 20 Sqs. (Sfd) - Tear Off Existing (Y/N): Yes - Existing No. Of Layers: One/Tile - New Sheathing (Y/N): No - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. Thi

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2019
  • Now
    Roof replacementExpected 2024 to 2034