LAHomework Sign in
Glendale, CA 91206 · E Chevy Chase Dr

2178 E Chevy Chase Dr

Built 1947 · 1,333 sq ft
LOT 7,138 SQ FT · 1 STRUCTURE · APN 5662-017-022Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1947
Living area
1,333 sqft
Lot size
7,138 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5662-017-022

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2012
Expected 2032 to 2042From the 2012 permit
20262035
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 244 homes on E Chevy Chase Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileHeating & cooling: Connection Of Equipment To Gas System, Need Number Of New Fau : 1 Number Of Fau Up To 100,000 Btu (*) : 1 Number Of Fau Over 100,000 Btu (*) : 0 Up To And Including 3 Hp Compressors, Condensers : 1 3 Hp To 15 Hp Compressors, Condensers : 0 Electrical A/C & Compressor Added, Enter Quantity To Apply W
  • 2016
    permit on fileElectrical: 2 Circuits, 1 Switchboard
  • 2012
    permit on fileRoof: Reroof As Follows: This Is A Change Of Roofing Material (Y/N): N Proposed Roofing Material: Class A Squares (100 Sf) Being Installed: 15 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: 2-3 New Sheathing Being Installed (Y/N): N High Fire Hazard Zone (Y/N): Y All Tear-Offs Require Solid Sheath
  • 2011
    permit on fileRoof: Residential Reroof As Follows: Sfd With Attached Garage This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Comp Shingle Squares (100 Sf) Being Installed: 4 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: 2 New Sheathing Being Installed (Y/N): No High Fire Hazard Zone (Y
  • 2006
    permit on fileRoof: Residential Reroof As Follows:- - - This Is A Change Of Roofing Material (Y/N): No - Proposed Roofing Material: Comp Shingle Class A - Squares (100 Sf) Being Installed: 10 Sqs. - Tear Off Existing (Y/N): Yes - Existing Layers Of Roofing: 2/3 Layers - New Sheathing Being Installed (Y/N): No - High Fi

Manage this home to schedule a service or to update the timeline.