LAHomework Sign in
Los Angeles, CA 90049 · S Saltair Ave

217 S Saltair Ave

Built 2011 · 6,633 sq ft
LOT 14,739 SQ FT · 2 STRUCTURES · APN 4404-019-014Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2011
Living area
6,633 sqft
Lot size
14,739 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
6
Home type
Single-family
Parcel (APN)
4404-019-014

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2031 to 2041From build year 2011
20262035
HVACWorth a look now
Expected 2026 to 2031From build year 2011
20262035
Water heaterWorth a look now
Expected 2021 to 2026From build year 2011
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 69 homes on S Saltair Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 8 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Prod
  • 2024
    permit on fileSolar: (Eplan) Pv1 Pc For Installation Of Roof Mounted Solar Panels And Installation Of Energy Storage System. Pv System Includes 65 Ac Modules With Integrated Microinverters, 2 Energy Storage System, 1 Load Cneter, 1 Backup Load Cneter, And 1 Tesl Backup Gateway Connected To Existing Main Service Panel. S
  • 2024
    permit on file, unconfirmedSolar: E-Plan, Module Changed To Dc Maxeon Panels. New System Size 24.36 Kwdc And 56 Modules.
  • 2019
    permit on fileGeneral remodel: Enclose (E) Covered Porch, Add Three Windows At Second Floor Of (E) Si · BERCOW - O'BYRNE CONSTRUCTION
  • 2015
    permit on file, unconfirmedRoom addition: Second Floor Addition To Existing Two Story Single Family Dwelling · PREMIER GENERAL CONTRACTORS INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2021 to 2026
  • Now
    HVAC replacementExpected 2026 to 2031
  • 2031
    Roof replacementExpected 2031 to 2041