LAHomework Sign in
Los Angeles, CA 90063 · N Herbert Ave

217 N Herbert Ave

Built 1908 · 1,496 sq ft
LOT 7,464 SQ FT · 3 STRUCTURES · APN 5233-009-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1908
Living area
1,496 sqft
Lot size
7,464 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5233-009-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 171 homes on N Herbert Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileKitchen: ** No Structural Work Is Being Done** Kitchen Remodel, Drywall Repair As Needed, Remove And Replace Counter Tops, Cabinets, Sink, Garbage Disposal, Dishwasher, Range Hood, Lights, Gfcis, And Switches.
  • 2025
    permit on fileHeating & cooling: ** No Structural Work Is Being Done** Mechanical For Scope Of Work: Kitchen Remodel, Drywall Repair As Needed, Remove And Replace Counter Tops, Cabinets, Sink, Garbage Disposal, Dishwasher, Range Hood, Lights, Gfcis, And Switches.
  • 2025
    permit on filePlumbing: ** No Structural Work Is Being Done** Plumbing For Scope Of Work: Kitchen Remodel, Drywall Repair As Needed, Remove And Replace Counter Tops, Cabinets, Sink, Garbage Disposal, Dishwasher, Range Hood, Lights, Gfcis, And Switches.
  • 2025
    permit on fileElectrical: ** No Structural Work Is Being Done** Electrical For Scope Of Work: Kitchen Remodel, Drywall Repair As Needed, Remove And Replace Counter Tops, Cabinets, Sink, Garbage Disposal, Dishwasher, Range Hood, Lights, Gfcis, And Switches.
  • 2025
    permit on fileHeating & cooling: Installation Of 3Ton Heat Pump Condenser And Air Handler Air Ducts Installation(10)
  • 2025
    permit on file, unconfirmedSolar: Installing 10 Roof Mounted Pv Modules, 10 Micro Inverters 4.100Kw And 1 Ess.
  • 2025
    permit on fileGeneral remodel: Voluntary Seismic Retrofit With Cripple Wall Per Ladbs Standard Plan, Detail #7 & #9
  • 2025
    permit on file, unconfirmedSolar: Install Roof Mounted Pv Solar System Rated At 7.040 With The Following Equipment: [16] Silfab Sil- 440Qd [16] Enphase Iq8M [2] Enphase 5P Battries [1] Controler 3 [1] Backup Panel
  • 2025
    permit on file, unconfirmedElectrical: Edison Located Sub Panel 200 Amps
  • 2019
    permit on fileGeneral remodel: 18 Window Replacement (Like For Like)

Manage this home to schedule a service or to update the timeline.