LAHomework Sign in
Palmdale, CA 93551 · W Avenue M8

2157 W Avenue M8

Built 1954 · 1,025 sq ft
LOT 109,260 SQ FT · 5 STRUCTURES · APN 3111-009-023Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1954
Living area
1,025 sqft
Lot size
2.51 acres
Structures on lot
5 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
3111-009-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 45 homes on W Avenue M8 →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on filePool: New Pool 14X30 (420 Sf). Standard Plan #26077-25
  • 2023
    permit on file, unconfirmedElectrical: Temp Power
  • 2022
    permit on file, unconfirmedElectrical: Walk Through For Electrical Meter, And Main Panel Upgrade, Add 2 Sub-Panels
  • 2022
    permit on file, unconfirmedRoof: 500 Sq Ft Addition (Legalizing An Unpermitted Addition)- Add Master Bedroom, Master Bathroom, Change Out 2 Windows, Change Out Electric Plugs Throughout The House, Change Out Plumbing Fixtures In Kitchen & Existing Bathrooms, Reroof Using Cool Roof Compliant Material, Change Out Hvac System (Backyar

Manage this home to schedule a service or to update the timeline.