LAHomework Sign in
Los Angeles, CA 90210 · Coldwater Canyon Dr

2141 Coldwater Canyon Dr

Built 1948 · 2,791 sq ft
LOT 11,763 SQ FT · 3 STRUCTURES · APN 4387-023-005Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
2,791 sqft
Lot size
11,763 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
4387-023-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 215 homes on Coldwater Canyon Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedPool: Proposed Pool Remodel - All Work Within Inside Ex Pool Shell: Add New 8'11"X 8'3" Spa, Baja Shelf, Reduce Depth To Max 6' & Thicken Pool Shell Per Plan. New Pool Cover Vault. All Work Per City Std Plan #268 & Suppl Engr Details.
  • 2017
    permit on fileBathrooms: Bathroom (1) Remodel For Residential Buildings (No Structural Changes) · SLATER DEVELOPMENT

Manage this home to schedule a service or to update the timeline.