LAHomework Sign in
Los Angeles, CA 90026 · Echo Park Ave

2136 Echo Park Ave

Built 1922 · 1,348 sq ft
LOT 6,336 SQ FT · 1 STRUCTURE · APN 5420-035-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1922
Living area
1,348 sqft
Lot size
6,336 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5420-035-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 227 homes on Echo Park Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileGeneral remodel: Converting Existing 1 Car Garage Into New 175Sf Storage
  • 2023
    permit on fileGeneral remodel: Replace 15 Window(S). Same Size, Location, Number, Type. Replace Drywall/Plaster (Patch And Paint). Non-Structural Repair Only. Water Damage, Termite Damage/ Dry Rot Repair Less Than 10% Of Replacement Cost Of Residential Buildings..
  • 2023
    permit on fileGeneral remodel: Complete Work Done Under Previously Expired Permit #_____04014-10000-10257_____. Work Is ___75___% Complete (Minimum 75% Percent Completed As Determined By Inspection).
  • 2023
    permit on fileGeneral remodel: Converting Existing Pantry Into Powder Room In Existing Sfd
  • 2023
    permit on fileElectrical: Upgrade Main Panel And Change Contols, Some Old Wiring
  • 2023
    permit on filePlumbing: Install Sgsov
  • 2023
    permit on fileHeating & cooling: New Hvac

Manage this home to schedule a service or to update the timeline.