LAHomework Sign in
Beverly Hills, CA 90212 · S Spalding Dr

211 S Spalding Dr Unit 106n

Built 1975 · 2,383 sq ft
SHARED CONDO LOT · APN 4328-007-022Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1975
Living area
2,383 sqft
Lot
Shared (condo complex)
Bedrooms
2
Bathrooms
3
Home type
Condo / townhome
Parcel (APN)
4328-007-022

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedElectrical: (E-Plan) Install 4 New 80Amp Ev Chargers
  • 2025
    permit on file, unconfirmedElectrical: Install New 150 Kva 480-208/120V Transformer To Accommodate Installing 4 New 80Amp Ev Chargers (E-Plan Under Bs2501752)
  • 2024
    permit on file, unconfirmedElectrical: (E-Plan) 1. Replace The Existing 1,200A, 480/277V, 3-Phase, 4W Main Switchboard With Same Size & Reconnect The (E) Loads. 2. Replace 800A208/120V, 3-Phase, 4W W/ New Same Size And Reconnect The Existing Loads. 3. Replace Two Sub-Panels W/ Same
  • 2024
    permit on file, unconfirmedElectrical: Relocate Hvac Unit + Closet Wall/Door By 2' For Elec Panel Clearance In Elec Closet
  • 2024
    permit on file, unconfirmedPlumbing: (E-Plan) Replacement Of Domestic Hot And Cold Water System And The Dwv Pipes For The Entire Complex- Pipes Inside The Walls Of Both Buildings. Asbestos Clearance (Bs2402348) Required For Each Portion Of Building Before Starting Any Work.
  • 2024
    permit on file, unconfirmedGeneral remodel: Building Element (Drywall, Ceiling, Etc.) Restore Like For Like After Completion Of Plumbing Work Per Bs2400978
  • 2024
    permit on file, unconfirmedHeating & cooling: Relocate Hvac Unit & Closet Wall/Door By 2' For Elec Panel Clearance In Elec Closet
  • 2024
    permit on file, unconfirmedHeating & cooling: Relocate Hvac Unit & Closet Wall/Door By 2' For Elec Panel Clearance In Elec Closet
  • 2023
    permit on file, unconfirmedGeneral remodel: Retile At Building Entrance Of 550 Square Ft
  • 2023
    permit on file, unconfirmedRoof: (E-Plan) Install 84X Rigid Roof Tieback Anchors On Existing Concrete Roof Slab Of The North & South Buildings For Fall Protection And Exterior Building Maintenance (Ebm) Equipment Tie-Down Under Cal-Osha Regulation Section 3291.
  • 2023
    permit on file, unconfirmedGeneral remodel: Retile In Basement At Entrance To Elevator Lobby - 500 Sqft
  • 2022
    permit on file, unconfirmedPool: Resurface Fiberglass Coating At (E) Spa
  • 2022
    permit on file, unconfirmedGeneral remodel: Pedestrian Protection Barricade On Sidewalk
  • 2022
    permit on file, unconfirmedGeneral remodel: (1) Window Replacement Like For Like
  • 2021
    permit on file, unconfirmedGeneral remodel: Repair The Guardrails On The Balconies Of Each Condo Unit (Total #48)- Remove Veritical Pickets And Bottom Hortizontal Support To Install Clear Glass Panels In Existing Guardrail Frame Pl2100205
  • 2021
    permit on file, unconfirmedPlumbing: South Tower -- Replace Copper Piping For Hvac Water Loop, 6 Stacks (Entire Building [Floors 1-8])
  • 2021
    permit on file, unconfirmedPlumbing: North Tower -- Replace Copper Piping For Hvac Water Loop, 6 Stacks (Entire Building [Floors 1-8])

Manage this home to schedule a service or to update the timeline.