LAHomework Sign in
Santa Monica, CA 90402 · Palisades Ave

210 Palisades Ave

Built 1910 · 3,077 sq ft
LOT 17,430 SQ FT · 1 STRUCTURE · APN 4293-014-006Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1910
Living area
3,077 sqft
Lot size
17,430 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
4293-014-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2021
Expected 2041 to 2051From the 2021 permit
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 51 homes on Palisades Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileRoof: Installation Of Dormer Roof Over Existing Second Floor Bathroom. No Additional Square Feet Added, No Fixtures Added Or Moved. New Roof And Ceiling Area Is 95 Square Feet Located On Southwest Side Of Existing Gable Roof That Is 23 Feet-2 Inches Above Grade. No Increase In Height And New Vertical Wall
  • 2021
    permit on fileHeating & cooling: Install (1) 5Ton Condenser And (1) 5Ton Evaporator Coil For Downstairs In The Basement, (1) 2.5Ton Air Handler, (1) 2.5Ton Heat Pump Condenser Unit And (5) Flexible Ducts In The Attic, Both Condensers Will Be Located In The East Side Of The House, The Condensers Are 11Feet Away From Next Property.
  • 2021
    permit on file, unconfirmedElectrical: Provide Three (3) Circuits For Hvac, Install Three (3) Can Light And Install Three (3) Gfci In Bathroom.

Manage this home to schedule a service or to update the timeline.