LAHomework Sign in
Northridge, CA 91326 · Sardinia Way

20849 Sardinia Way

Built 2006 · 2,655 sq ft
LOT 6,783 SQ FT · 1 STRUCTURE · APN 2701-071-025Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2006
Living area
2,655 sqft
Lot size
6,783 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2701-071-025

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2026 to 2036From build year 2006
20262035
HVACWorth a look now
Expected 2021 to 2026From build year 2006
20262035
Water heaterWorth a look now
Usually done by 2021From build year 2006

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 31 homes on Sardinia Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedGeneral remodel: Eplan. Enclose 2Nd Floor Loft With New Den Within Existing Footprint (200 Sf).
  • 2024
    permit on fileElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2021
    permit on fileSolar: Permit Fee Is $0.00 Due To Ab1414[E-Plan] Install Roof Mounted Pv, 12.24Kw, 36 Modules, 2 Tesla Powerwall Ess, (1) 200A Sub Panel, (1) 225A Sub Panel Interconnecting Through The Main Service Panel.
  • 2020
    permit on file, unconfirmedSolar: Installation Of Roof-Mounted Solar Pv System, Not Exceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2017
    permit on file, unconfirmedElectrical: Electrical Permit · ADI ELECTRICAL SERVICES

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2021
  • Now
    HVAC replacementExpected 2021 to 2026
  • Now
    Roof replacementExpected 2026 to 2036