LAHomework Sign in
Porter Ranch, CA 91326 · Lugano Way

20757 Lugano Way

Built 2004 · 2,918 sq ft
LOT 7,003 SQ FT · 1 STRUCTURE · APN 2701-065-042Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2004
Living area
2,918 sqft
Lot size
7,003 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
2701-065-042

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2024 to 2034From build year 2004
20262035
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 64 homes on Lugano Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileHeating & cooling: Replace (2) Split Gas Systems With (2) Split Heat Pumps
  • 2025
    permit on fileElectrical: [Eplan] Sfd, Installing:(2) Tesla Powerwall 2(2) Panels
  • 2025
    permit on fileSolar: [E-Plan] New Pv1 Roof Mounted Solar System As An Addition To Existing Pv + Ess System. 7.200 Kw Dc 16 Modules,16 Micro-Inverters
  • 2024
    permit on fileElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2020
    permit on fileSolar: [E-Plan] Installation Of Additional Battery Backup System To Existing Pv System. Scope Includes:(N) 2 Tesla Powerwall Battery Backup (Ess). (N) 3 30A Ess Ac Disconnects.(N) 200A Critical Load Center. (N) 200A Upsized Main Breaker.
  • 2019
    permit on file, unconfirmedElectrical: Plan Check For Energy Stroage Battery Back Up System Install Into Exis · LA SOLAR GROUP INC
  • 2017
    permit on filePlumbing: Plumbing Permit · DANIELS PLUMBING CO
  • 2014
    permit on file, unconfirmedElectrical: Electrical Permit · LA SOLAR GROUP INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2024 to 2034