LAHomework Sign in
Los Angeles, CA 91306 · Parthenia St

20728 Parthenia St

Built 1941 · 600 sq ft
LOT 18,249 SQ FT · 2 STRUCTURES · APN 2780-008-062Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1941
Living area
600 sqft
Lot size
18,249 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
1
Bathrooms
1
Home type
Single-family
Parcel (APN)
2780-008-062

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 85 homes on Parthenia St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileGeneral remodel: Interior Remodel To Units 20728, And 20730 And Exterior Remodel To 20730 To Replace (E) Window With New Exterior Access Door.
  • 2026
    permit on fileRoom addition: Exterior Remodel Within The (E) Adu. Remove Two Windows And Replace With French Doors. Work Per Wfpp.
  • 2026
    permit on fileGeneral remodel: Replace Two Exterior Window With New 36" X 80" French Door To The (E) A.D.U.
  • 2025
    permit on fileRoom addition: New Attached Covered Breezeway Connecting Single Family Dwellings To Make A Duplex And To Change From Sewer To Owts, All Work Per Engineering
  • 2025
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2025
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2025
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2025
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2024
    permit on fileElectrical: Install Electrical Circuit For Clothes Dryer
  • 2024
    permit on fileElectrical: Install Electrical Circuit For Clothes Dryer
  • 2024
    permit on fileElectrical: Install New 400 Amp Main Service
  • 2024
    permit on filePlumbing: Install Washer And Dryer
  • 2024
    permit on fileHeating & cooling: Install New Dryer Vent
  • 2024
    permit on filePlumbing: Install New Washer And Dryer
  • 2024
    permit on fileHeating & cooling: Install New Dryer
  • 2024
    permit on fileHeating & cooling: Install New Dryer
  • 2024
    permit on filePlumbing: Install New Washer And Dryer
  • 2024
    permit on filePlumbing: Dryer
  • 2024
    permit on filePlumbing: Washer Duplicate
  • 2024
    permit on filePlumbing: Increase Main Supply To 1 Inch
  • 2023
    permit on fileElectrical: Temporary Construction Power Pole
  • 2023
    permit on fileElectrical: Install Electrical System To Support New Adu Permit. Permit To Include All Required Sub Panels, Breakers, Dedicated Circuits, Lighting, Receptacles, And Supply Power To Fixtures And Appliances
  • 2023
    permit on fileElectrical: Install Electrical System To Support New Sfr Permit. Permit To Include All Required Sub Panels, Breakers, Dedicated Circuits, Lighting, Receptacles, And Supply Power To Fixtures And Appliances
  • 2023
    permit on fileElectrical: Electrical - Sacrificial Due To Express Permit Deficiancies
  • 2023
    permit on fileElectrical: Electrical - Sacrificial Due To Express Permit Deficiancies
  • 2023
    permit on fileElectrical: Electrical - Sacrificial Due To Express Permit Deficiancies
  • 2023
    permit on fileElectrical: Install Electrical System To Support New Sfr Permit. Permit To Include All Required Sub Panels, Breakers, Dedicated Circuits, Lighting, Receptacles, And Supply Power To Fixtures And Appliances
  • 2023
    permit on filePlumbing: Install Plumbing System To Support New Sfr Permit To Include Water Supply Tie Int, Waste, Underground Rough And Finish
  • 2023
    permit on fileHeating & cooling: Provide Heating And Cooling System To Support New Sfr Permit. Permit To Include Installation Of Five Zone Mini Split System, Bathroom Fans, Kitchen Hood, And Associated Venting.
  • 2023
    permit on fileHeating & cooling: Provide Heating And Cooling System To Support New Adu Permit. Permit To Include Installation Of Five Zone Mini Split System, Bathroom Fans, Kitchen Hood, And Associated Venting.
  • 2023
    permit on filePlumbing: Install Plumbing To Support New Sfr Permit. Permit To Include Tie Ins For Water, Sewer, Underground And Rough, And Finish Plumbing.
  • 2023
    permit on filePlumbing: Install Plumbing To Support New Adu Permit. Permit To Include Tie Ins For Water, Sewer, Underground And Rough, And Finish Plumbing.
  • 2023
    permit on fileHeating & cooling: Provide Heating And Cooling System To Support New Sfr Permit. Permit To Include Installation Of Five Zone Mini Split System, Bathroom Fans, Kitchen Hood, And Associated Venting.
  • 2023
    permit on filePlumbing: Install Plumbing System To Support New Adu Permit To Include Water Supply Tie In To Existing Building Water, Existing Waste, Underground, Rough, And Finish.

Manage this home to schedule a service or to update the timeline.