LAHomework Sign in
Los Angeles, CA 91306 · Acre St

20611 Acre St

Built 1956 · 1,479 sq ft
LOT 7,977 SQ FT · 1 STRUCTURE · APN 2780-011-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
1,479 sqft
Lot size
7,977 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
2780-011-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 98 homes on Acre St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileHeating & cooling: New Central Hvac Split System Installation (Replacement). Heat Pump Application. New Air Ducts Installation (Replacement)
  • 2023
    permit on fileGeneral remodel: Window (8 ) Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 150.2(B) 1B Of Title 24
  • 2023
    permit on fileElectrical: Provide And Install 200Amps Main Panel.Provide And Install Dedicated Circuit 240Volt -15Amps To Accommodate Heat Pump In The Utility Closet In The Hallway.Provide And Install Switch And Light For Service In The Utility Closet.Provide And Install Wr Gfci Outside By The Ac Condenser.

Manage this home to schedule a service or to update the timeline.