LAHomework Sign in
Northridge, CA 91326 · Bergamo Way

20501 Bergamo Way

Built 2003 · 2,857 sq ft
LOT 7,346 SQ FT · 1 STRUCTURE · APN 2701-050-045Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2003
Living area
2,857 sqft
Lot size
7,346 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2701-050-045

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2023 to 2033From build year 2003
20262035
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 75 homes on Bergamo Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileSolar: [Eplan] Installation Of 1 Powerwall Into An Existing Pv System.
  • 2023
    permit on fileHeating & cooling: Replacement Of 5 Ton Condensing Unit On Side Yard With Furance In Attic, Replacement Of 2 Duct Runs.
  • 2022
    permit on fileSolar: E-Plan.Plan Check For An Installation Of 10.2 Kw Dc / 7.6 Kw Aw Pv1 System With (24) Modules, (1) 7.6 Kw Tesla Powerwall+, (1) 13.Kwh Ess, And (2) Load Center Interconnecting Through A New Main Service Upgrade.
  • 2022
    permit on fileElectrical: Install New 200A Main Panel
  • 2022
    permit on fileSolar: [Eplan] Plan Check For Changes To An Approved Set, Chnages Include Revisions To Layout, And Increasing Module Count From 24 Modules To 26 Modules. All Changes Are Clouded.
  • 2022
    permit on fileElectrical: Install An Ev For Car Charging.
  • 2021
    permit on filePlumbing: Replace Toilet
  • 2019
    permit on file, unconfirmedElectrical: Electrical Permit · TESLA ENERGY OPERATIONS INC
  • 2019
    permit on file, unconfirmedKitchen: Kitchen Remodel For Residential Buildings (No Structural Changes). · A A A REMODELING & RESTORATION INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2023 to 2033