LAHomework Sign in
Northridge, CA 91326 · Via Urbino

20430 Via Urbino

Built 2012 · 4,117 sq ft
LOT 27,718 SQ FT · 1 STRUCTURE · APN 2701-060-008Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2012
Living area
4,117 sqft
Lot size
27,718 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
2701-060-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACComing up
Expected 2027 to 2032From build year 2012
20262035
Water heaterWorth a look now
Expected 2022 to 2027From build year 2012
20262035
See 1 more system expected later
RoofLater
Expected 2032 to 2042Original, built 2012
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 30 homes on Via Urbino →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileSolar: (Eplan) Pv1 Pc For Installation Of Roof Mounted Solar Panels. Pv System Includes 35 Modules With 35 Optimizers And 1 Central Inverter System Connected To Main Service Panel. System Size Is 13.83Kw Dc/11.4Kw Ac.
  • 2022
    permit on fileElectrical: Derate Main Breaker To 175 Amps
  • 2022
    permit on file, unconfirmedElectrical: Derate Main Panel 175Amp
  • 2013
    permit on filePool: Construct (N) 36' X 15' Pool With Baja Entry/Step And 8' X 8' Spa Per · ALL OUTDOOR G O CONSTRUCTION INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2022 to 2027
  • 2027
    HVAC replacementExpected 2027 to 2032