LAHomework Sign in
Venice, CA 90291 · Glyndon Ave

2038 Glyndon Ave

Built 2024 · 5,204 sq ft
LOT 5,415 SQ FT · 2 STRUCTURES · APN 4242-017-010Lot Structure
Nothing due in the next 5 years
Here is what to keep track of. Mark things as done as they happen and your timeline stays current.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2024
Living area
5,204 sqft
Lot size
5,415 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
7
Home type
Single-family
Parcel (APN)
4242-017-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

Nothing due in the next 5 years. Each system below shows its typical replacement years.
Typical replacement years
RoofLater
Expected 2044 to 2054Original, built 2024
HVACLater
Expected 2039 to 2044Original, built 2024
Water heaterLater
Expected 2034 to 2039Original, built 2024
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 127 homes on Glyndon Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedGeneral remodel: Capture Linkage Fee Under Permit Number 22010-30000-03461 And Termination Of Affidavit # 20220876772
  • 2025
    permit on file, unconfirmedSolar: [E-Plan] Install 2 Tesla Powerwall 3 (240V) Batteries. Existing 4.0 Kw Dc Roof-Mounted Solar System (10 Aptos 400W Panels, 1 Tesla 7600W Inverter).
  • 2024
    permit on fileSolar: Eplan; Install Residential Roof Mounted Solar Pv System Rated At 4Kw Dc/ 7.6Kw Ac With 10 Pv Modules, And 1 Inverter.
  • 2024
    permit on fileElectrical: Install Receptacle For A Sump Pump
  • 2024
    permit on filePlumbing: Install New Sump Pump
  • 2022
    permit on fileElectrical: Install 100M Temporary Power Pole
  • 2022
    permit on filePlumbing: Temporary Hose Bib

Manage this home to schedule a service or to update the timeline.