LAHomework Sign in
Los Angeles, CA 90068 · Holly Hill Ter

2030 Holly Hill Ter

Built 1923 · 1,470 sq ft
LOT 5,073 SQ FT · 1 STRUCTURE · APN 5575-003-004Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
1,470 sqft
Lot size
5,073 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
5575-003-004

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 12 homes on Holly Hill Ter →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedRoom addition: Interior Remodel Of (E) 1St Floor Lvl Of House Including Kitchen, Bathroom, (2) Bedrooms W/ Addition Of Powder Room, And Replacement Of 5 Windows. Basement Level Unchanged - All Work Per Engineer
  • 2022
    permit on file, unconfirmedGeneral remodel: Foundation Upgrade And Partial Sister Foundation Per Engineering And La City Standard Plan For Anchor Bolting Bracing Foundation
  • 2022
    permit on file, unconfirmedElectrical: Upgrade Electrical Panel To Carry Larger Voltage Load. Move The Electrical Panel From Inside To Outside Of The House.
  • 2022
    permit on file, unconfirmedWater heater: Moving Of Existing Water Lines To Accomodate New Water Heater. Repair/Replace Of Broken Drain Lines. Repair/Replace Of Gas Lines. Repair/Replace Vent Lines.

Manage this home to schedule a service or to update the timeline.